只给你推荐更合适的锅炉和反应釜 不会为了蝇头小利 而违背原则
![](http://tiebapic.baidu.com/forum/w%3D580/sign=6946b5a5140fd9f9a0175561152fd42b/e528cf177f3e67094b83df267ec79f3dfadc5592.jpg?tbpicau=2025-02-27-05_bcfbe62340136945147763a4da9189a7)
![](http://tiebapic.baidu.com/forum/w%3D580/sign=8c8d28adaef81a4c2632ecc1e7286029/d764d7c8a786c917ff80c8e08c3d70cf39c75792.jpg?tbpicau=2025-02-27-05_4338105470351255b53ed9c9c03f7d16)
![](http://tiebapic.baidu.com/forum/w%3D580/sign=14dea3dac244ebf86d716437e9fbd736/67b193cad1c8a786b6a9d0d72209c93d72cf5092.jpg?tbpicau=2025-02-27-05_cf73c2c16920e90a6318a38e9b85836c)
![](http://tiebapic.baidu.com/forum/w%3D580/sign=06fa44115f4c510faec4e212505b2528/9366a186c9177f3ee6b766d435cf3bc79d3d5692.jpg?tbpicau=2025-02-27-05_b11b5e8e094491a1e6dd3590fd009f54)
![](http://tiebapic.baidu.com/forum/w%3D580/sign=51df7aff28224f4a5799731b39f69044/93a7b5de9c82d1582f9b5568c50a19d8bd3e4278.jpg?tbpicau=2025-02-27-05_80af01db65ca0311d7bee219ca5051c3)
根据用户使用燃料不同按设计院提供的锅炉房系统图安装燃气系统或燃油系统。燃油油罐及燃气罐和锅炉房外墙基脚线的防火间距最小15米以外,如特殊原因要缩短防火间距时,应得到消防部门及有关部门同意,若采用地下布置,则加覆盖层0.5m以上,周围加防火墙,地下布置时油箱地脚螺栓必须拧紧,或采用其它防油箱移位措施. 且燃气管道上要装燃气的温度和压力的仪表,及燃气消耗量的显示、记录、积算表。
WNS锅炉安装之前,为了能迅速运行起来,必须做好下列准备工作: 1、人员配备:锅炉安装须有专人负责,司炉工参加并配有管道工、钳工、电工、起重工、冷作工、电焊工及辅助工。 2、技术准备:组织有关人员熟悉全套锅炉图纸、技术资料。依据国家现行有关规程、规范、技术标准,编制施工方案、各项计划、工艺规程及技术措施等。 3、确定安装地点: 安装地点应符合TSG G0001-2012《锅炉技术监察规程》、GB50041-2008《锅炉房设计规范》及《锅炉节能技术监督管理规程》关于锅炉房布置的要求。 4、地基准备: 地基图仅供用户及土建部门参考,基础施工具体情况按当地土质而定,参考本地基图或土建设计部门的锅炉房图纸进行施工,浇灌主机及各种辅机承重部分的混凝土,预留各种部分地脚螺栓孔。 5、设备验收: 设备验收的注意事项: ⑵开箱时要选择合适的开箱工具,不要用力过猛,以免损坏箱内设备; ⑵清点时应根据我公司提供的出厂清单,核实设备零部件名称、型号、规格和数量,随机附件、备件、附属资料,以及出厂合格证和其它技术文件是否齐全; ⑶设备的转动和滑动部件,在防锈油未清除前不得转动和滑动,检查时应清除油脂; ⑷设备开箱时,要注意环境条件,如风、雪、雨等天气; ⑸ 对易损坏的仪表及小零件和阀门要妥善保管,锅炉主机等,应垫以方木,防止受潮腐蚀; ⑹ 锅炉大件在卸车时,如需要吊车起吊就位时,应考虑起重设备的起吊能力(按有关规定)。 6、.基础的验收和处理: 设备在安装就位前,须进行基础的检查验收工作,检查基础的尺寸是否与图纸相符,外形及与设备安装的相关尺寸,并对基础的内在质量也要进行了解和检查,以防在设备就位后因基础倾斜,下沉或强度不够等而出现问题。 基础经检查后,如发现不合要求的地方,应进行修整处理。
![](http://tiebapic.baidu.com/forum/w%3D580/sign=6946b5a5140fd9f9a0175561152fd42b/e528cf177f3e67094b83df267ec79f3dfadc5592.jpg?tbpicau=2025-02-27-05_bcfbe62340136945147763a4da9189a7)
![](http://tiebapic.baidu.com/forum/w%3D580/sign=8c8d28adaef81a4c2632ecc1e7286029/d764d7c8a786c917ff80c8e08c3d70cf39c75792.jpg?tbpicau=2025-02-27-05_4338105470351255b53ed9c9c03f7d16)
![](http://tiebapic.baidu.com/forum/w%3D580/sign=14dea3dac244ebf86d716437e9fbd736/67b193cad1c8a786b6a9d0d72209c93d72cf5092.jpg?tbpicau=2025-02-27-05_cf73c2c16920e90a6318a38e9b85836c)
![](http://tiebapic.baidu.com/forum/w%3D580/sign=06fa44115f4c510faec4e212505b2528/9366a186c9177f3ee6b766d435cf3bc79d3d5692.jpg?tbpicau=2025-02-27-05_b11b5e8e094491a1e6dd3590fd009f54)
![](http://tiebapic.baidu.com/forum/w%3D580/sign=51df7aff28224f4a5799731b39f69044/93a7b5de9c82d1582f9b5568c50a19d8bd3e4278.jpg?tbpicau=2025-02-27-05_80af01db65ca0311d7bee219ca5051c3)
根据用户使用燃料不同按设计院提供的锅炉房系统图安装燃气系统或燃油系统。燃油油罐及燃气罐和锅炉房外墙基脚线的防火间距最小15米以外,如特殊原因要缩短防火间距时,应得到消防部门及有关部门同意,若采用地下布置,则加覆盖层0.5m以上,周围加防火墙,地下布置时油箱地脚螺栓必须拧紧,或采用其它防油箱移位措施. 且燃气管道上要装燃气的温度和压力的仪表,及燃气消耗量的显示、记录、积算表。
WNS锅炉安装之前,为了能迅速运行起来,必须做好下列准备工作: 1、人员配备:锅炉安装须有专人负责,司炉工参加并配有管道工、钳工、电工、起重工、冷作工、电焊工及辅助工。 2、技术准备:组织有关人员熟悉全套锅炉图纸、技术资料。依据国家现行有关规程、规范、技术标准,编制施工方案、各项计划、工艺规程及技术措施等。 3、确定安装地点: 安装地点应符合TSG G0001-2012《锅炉技术监察规程》、GB50041-2008《锅炉房设计规范》及《锅炉节能技术监督管理规程》关于锅炉房布置的要求。 4、地基准备: 地基图仅供用户及土建部门参考,基础施工具体情况按当地土质而定,参考本地基图或土建设计部门的锅炉房图纸进行施工,浇灌主机及各种辅机承重部分的混凝土,预留各种部分地脚螺栓孔。 5、设备验收: 设备验收的注意事项: ⑵开箱时要选择合适的开箱工具,不要用力过猛,以免损坏箱内设备; ⑵清点时应根据我公司提供的出厂清单,核实设备零部件名称、型号、规格和数量,随机附件、备件、附属资料,以及出厂合格证和其它技术文件是否齐全; ⑶设备的转动和滑动部件,在防锈油未清除前不得转动和滑动,检查时应清除油脂; ⑷设备开箱时,要注意环境条件,如风、雪、雨等天气; ⑸ 对易损坏的仪表及小零件和阀门要妥善保管,锅炉主机等,应垫以方木,防止受潮腐蚀; ⑹ 锅炉大件在卸车时,如需要吊车起吊就位时,应考虑起重设备的起吊能力(按有关规定)。 6、.基础的验收和处理: 设备在安装就位前,须进行基础的检查验收工作,检查基础的尺寸是否与图纸相符,外形及与设备安装的相关尺寸,并对基础的内在质量也要进行了解和检查,以防在设备就位后因基础倾斜,下沉或强度不够等而出现问题。 基础经检查后,如发现不合要求的地方,应进行修整处理。